Atlas Augusta Septic Installation (762) 320-6315

Septic tank installation in Augusta, GA

Septic tank installation for Augusta and Richmond County homes, plus new drain fields, pump tanks and full replacements, all built to Georgia's rules and inspected before a shovel of dirt goes back in.

Every job starts with a site visit and a free itemized estimate.

  • Established 2021
  • Open 24/7
  • Georgia jobs only
Drain field trenches and white header pipe behind a brick house in Augusta, GA

What septic work do we install around Augusta?

We install complete septic systems: the tank, the distribution box and lines, the drain field, and a pump tank when the ground calls for one. We also replace failed tanks and fields on homes that already have septic. Tap a job below for the details, the rules and the photos.

What do our septic jobs around Augusta look like?

Open trenches, level tanks and clean fields, photographed on our own jobs before the county inspector signed off and the ground was covered. These are the systems we build; no stock photos.

See all 42 job photos

Why do homeowners call us for septic work?

  • Established 2021Augusta company since 2021
  • Open 24/7Phone answered day and night
  • Free itemized estimateEach part of the job on its own line
  • Inspected before backfillEvery trench open until sign-off

Which Augusta soils give a septic field trouble?

Mostly the wet ones. A soil series even carries the city's name: the Augusta series, a stream terrace soil that is somewhat poorly drained and holds a seasonal high water table 12 to 24 inches down from December through May.

A drain field dug into ground like that in a dry August can be sitting in water by March. The fix is a shallower or longer field, or a different design, and it has to be decided before the permit, not after the first backup.

Sandy ground has its own catch. The USDA uses Augusta's two airports as climate stations for its Sand Hills site descriptions, which describe soils that start sandy or loamy and turn finer with depth, and hillside seeps that keep a water table within a foot of the surface from November through April. A dry-looking slope can still be wet a few feet down.

Underneath it all, the city sits where the Savannah River crosses the Fall Line (New Georgia Encyclopedia), so red clay and pale sand can show up on neighboring lots. That is why we read the soil report before we price anything.

Drain field lines on red clay ridges behind a house in Augusta, GA
Our field lines on red clay
Drain field lines and a header laid across a sandy lot in Augusta, GA
One of our fields in sandy ground

How does a septic tank installation run from first call to final inspection?

Five steps, in this order: site visit and estimate, soil evaluation, county permit, installation, and inspection before backfill. Skipping ahead is how systems fail early.

  1. Site visit and free itemized estimate

    We walk the lot, find the well, the property lines and the low spots, and write up each part of the job as its own line.

  2. Soil evaluation by a certified classifier

    Georgia requires soil evaluations to be done by people the Department of Public Health has certified. The report drives the size and type of field.

  3. Construction permit from the county

    Richmond County's environmental health office, one of the county offices in the Department of Public Health's East Central Health District, issues the permit once its site inspection shows workable soil, absorption and groundwater conditions.

  4. Installation

    Tank set level on firm bottom, lines run to the distribution box, trenches cut to the depth on the permit, and the pump tank wired if there is one.

  5. Inspection, then backfill

    The county inspects with everything open. Only after it passes do we cover the system, crown the trenches and seed or straw the disturbed ground.

Precast concrete septic tank lowered on chains into a sandy excavation in Augusta, GA
One of our precast tanks going in
New drain field trenches and an open septic tank on red clay in Augusta, GA
Our lines open for inspection
Excavator bucket beside a drain field trench being covered in Augusta, GA
Backfill after the inspection

Which towns around Augusta do we cover?

Augusta, Hephzibah and Blythe in Richmond County, and Evans, Martinez, Grovetown, Harlem and Appling in Columbia County. We do not take South Carolina jobs.

Each county has its own permit office, so the paperwork route depends on which side of the county line the lot sits. The service area page lists both offices, and the Columbia County page covers the steps there. Each town also has its own page:

Will a tank or field fit where you want it?

Georgia sets minimum distances. A septic tank has to sit at least 50 feet from any well, and a drain field at least 100 feet. Property lines, water lines, ponds and foundations each have their own minimums.

The setback planner draws those rings to scale around the spot you have in mind and flags anything that falls short. It is worth five minutes before you set a house pad or sign on a lot.

Septic installation questions we hear in Augusta

Do I need a permit to install a septic system in Augusta?
Yes. Georgia's rules say no one may start developing a lot that will use septic, or install a system, without a construction permit from the county health department. In Augusta that is the Richmond County office of the East Central Health District. We handle the paperwork side with you.
Who is allowed to install it?
Georgia requires septic tank contractors and soil classifiers to hold a current Department of Public Health certification, renewed every two years, under Rule 511-3-1-.16. Ask any installer to show a current certification before you sign anything.
How big does my septic tank need to be?
For a single-family home in Georgia the minimum is 1,000 gallons for one to four bedrooms, plus 250 gallons for each bedroom over four, and 50 percent more if the kitchen has a garbage grinder. The tank size calculator does the math for your house.
Can the inspector see the system before it is covered?
They have to. The rules say no one may backfill or use a new system until the final inspection is done. We schedule that inspection and leave the trenches open until it passes.
Does Augusta ground make septic harder?
On some lots, yes. Stream terrace soils near creeks can hold water within two feet of the surface through late winter, and sloping sandy ground can hide a seep. Other lots drain beautifully. The soil evaluation tells us which kind you have. See perc test and soil evaluation.
What does an estimate include?
A site visit, a look at the soil report or the plan for getting one, and a free itemized estimate that lists the tank, the field, any pump tank, the earthwork and the permit steps as separate lines, so you can see where the money goes.

Visits by appointment only. We come to your property; there is no walk-in office.

Tell us where the system goes

Give us the address and a line about the job. Expect a call back within one business day to book a time on site; your free itemized estimate is written after that visit.

No cost and no obligation. What you send stays with us and is used for this request alone.

Call (762) 320-6315Free estimate